Product Detail :
|
Balance works of investigation,survey and planning,design,construction and handing over of 3120 ews dus/flats (each of super built up area of 300 sft) in g plus 3 pattern with monolithic concrete construction (shear wall technology) and with suitable foundations as per soil conditions including internal infrastructure facilities such as water supply,sanitary and electrification under pmay (hfa) phase-ii with 2 years defect liability period under epc system at kadapa, rayachoti, badvel and yerraguntla ulbs.
|