Product Detail :
|
The work of laser alignment & dynamic balancing of fd fan, pa fan & id fan of boiler unit 1, 2 & 3. work of removal & installation of ms / gi / s.s piping of various size as and when required basis at various location for stage-ii & iii, wtps. rate contract for work of overhauling, servicing and breakdown maintenance with testing of 415 v abb / siemens make acb at unit 4,5,6 of wtps on as and when require basis. work of overhauling of sump pumps at various conveyor tunnel, f.o. trench and wagon tippler-1 & 5 tunnel of chp, wtps. work of attending daily, routine defects, preventive, breakdown, shutdown and emergency maintenance of various electrical auxiliaries of esp, wtps stage-1. work of providing man power for different job works for coal plant elect. maintenance at wtps as &when required basis for 05 months period.
|