Product Detail :
|
NHIDCL/JK/NH-244/EPC/ TunnelKm83/2025-26 Construction of balance work of Bi-directional Tunnel at Km 83rd and a Major Bridge between Km 82.675 and Km 82.925 on NH-244 in the UT of JK on EPC mode
|
Tender Detail : |
NHIDCL/JK/NH-244/EPC/ TunnelKm83/2025-26 #*. Construction of balance work of Bi-directional Tunnel at Km 83rd and a Major Bridge between Km 82.675 and Km 82.925 on NH-244 in the UT of JK on EPC mode |